簡歷編號:198851 查看次數:個人簡歷
基本資料 | ||||
---|---|---|---|---|
姓 名: | 梁先生 | 性 別: | 男 | ![]() |
出生年份: | 1985年 | 婚姻狀況: | 未婚 | |
民 族: | 漢 | 政治面貌: | 群眾 | |
畢業學校: | 江蘇科技大學 | 所學專業: | 船舶海洋工程 | |
最高學歷: | 大學本科 | 工作經驗: | 10年以上 | |
現所在地: | 江蘇南通 | 籍貫: | 遼寧朝陽 | |
技術特長: | 15年重工船舶鋼構工程等 制造行業質量管理經驗,歷經任職生產設計部門/質量管理部門 |
求職意向 | |||
---|---|---|---|
希望從事崗位: | 質量經理。質量主管,SQE,生產項目負責人等 | ||
希望工作地區: | 北京 上海 天津 浙江省 江蘇省 遼寧省 山東省 | ||
崗位類別: | 質檢/質量管理 生產部經理 監理 | 求職狀態: | 已離職,即刻到崗 |
是否要求住宿: | 是 | 月薪要求: | 面議 |
工作經歷 |
---|
EMPLOYMENT EXPERIENCES: Work Position: QA/QC/SQE/ ship-out-fitting designer/inspector- 15 years experience(personal experience involved- production quality control ship-building/ship-out-fitting production design/FPSO module platform oil& gas Petrochemical module/ Mining machinery Construction of steel structure/Draw the NDE MAP coating inspection production. and general pipes erection and piping fabrication & installation Hydro & pneumatic test. flushing, air blowing etc.) 2008-2014 in Taizhousanfu shipyard: production quality controll(hull TEAM)/shipbuilding ship-out-fitting production design, shiptype related International Ship bulk carrier/container vessel petrochemical carrier/ container vessel( 57000DWT/12000DWT/169000/16500 DWT) prepared review function test procedure (anchor windlass crane/hatch cover/ hose testing. rescue/lifeboat etc.). Attend dock test/ Navigation trial. Individuals have participated in the construction of 100 ships 2014-2023 in(Morimatsu (Jiangsu) Heavy Industry Co., Ltd.)森松江蘇重工:QA/QC inspector responsible : 1, area inspector controlling, Request and witness for inspection as per Project Specifications & Standard/Code Requirement/ITP 2, onsite inspection WPS/WPQ document/ welder qualification test 3, onsite inspection/witness fit-up, Material inspection, fit up & welding/ coating blasting, painting, hot dip galvanization. adhesion test 4, onsite inspection dimension/or pre-assemble/installation 5, onsite inspection Material certificate and size/marking characteristic 6, Steel structure erection and modification 7, As built drawing/procedure witness function test 8, approve punch item closing 9, open NCR analysis of causes/ rectification measures/ preventive measures 10, Final document inspection 11. inspection packing status 12, prepared /witness Material mechanical property/ Physicochemical test 13, checked service package, repair procedure, schedule and quality plan 14, inspection/witness PWHT/fire adjust 15, Draw the NDE MAP/ review/ write NDE(UT.MT.PT. RT )application sheet 16, organization/witness welder examination test 17, Coordinate with client side/factory side for question communication analysis meeting |
個人簡介 |
---|
武漢船舶技術學院:船舶工程系焊接技術及自動化專業畢業。 江蘇科技大學; 函授本科,船舶海洋工程畢業 CWI/CSWIP/ASNT-UT-II |
相關證書 |
---|
|
聯系方式 |
---|