工作經歷 |
---|
Work Experience 2005.7 to Present Inspection Engineer Project 1: North Field East Project Onshore LNG Facilities Client: Qatargas Operation Company Limited Manufacturer: Shanghai Matsuo Steel Structure Co., Ltd. Code/Standard: AWS D1.1,AISC 303,ASTM A36,ASTM F3125,GB/T1591,GB/T700 Responsibilities: Review MPS and ITP Raw material tracking Supervise produce process Dimension and visual inspection Witness NDE Final inspection Review and sort production documents and MDR Project 2: Three Mill Hill Project Client: Ok Tedi Mining Limited Manufacturer: Shanghai Matsuo Steel Structure Co., Ltd. Code/Standard: AS4100,AS 1554.1,AS 5131 Responsibilities: Review MPS and ITP Supervise produce process Dimension and visual inspection Witness NDE Witness lab test Final inspection Review and sort production documents and MDR Project 3: Invista Polymer III Phase Expansion Project Manufacturer: Shanghai LBT Engineering & Technology Co., Ltd Code/Standard: GB50205,GB50661,GB 50755 Responsibilities: Supervise produce process Review the WPS Monitor welder’s certificates Randomly checked fit up process Witness NDT process Checked dimensions and visual of members Reviewed relevant documents Final inspectionl Project 4: Yokosuka Thermal Power Plant Client: Mitsubishi Heavy Industries, Ltd. Manufacturer: Shanghai Baosteel Steel Structure Co., Ltd Code/Standard: JASS6,AWS D1.1 Responsibilities: Raw material tracking Review the WPS,PQR and ITP Monitor welder’s certificates Supervise produce process Dimension and visual inspection Witness lab test(tensile test, impact test, peeling test and cathodic disbanding test); Trace produce(Cutting,fit-up,pre-heating,dimension and visual inspection,blasting,coating,delivery); Review document Review and sort production documents and MDR Supervise Loading Project 5: Lamma Power Station Extension Unit 12 Project Client: Mitsubishi Heavy Industries, Ltd. Manufacturer: Shanghai Baosteel Steel Structure Co., Ltd Code/Standard: JASS6,AWS D1.1 Responsibilities: Raw material tracking Review the WPS,PQR and ITP Monitor welder’s certificates Supervise produce process Witness lab test(tensile test, impact test, peeling test and cathodic disbanding test); Trace produce(Cutting,fit-up,pre-heating,dimension and visual inspection,blasting,coating,delivery); Review document Review and sort production documents and MDR Supervise Loading Project 6: Saijo Power Station No.1 Client: Mitsubishi Heavy Industries, Ltd. Manufacturer: Shanghai Baosteel Steel Structure Co., Ltd Code/Standard: JASS6,AWS D1.1 Responsibilities: Review the WPS and PQR Monitor welder’s certificates Supervise produce process Dimension and visual inspection Witness the NDE Review documents Review the MDR Project 7: Misumi Power Plant No.2 Client: Mitsubishi Heavy Industries, Ltd. Manufacturer: Jiangsu Nuoyaxin Steel Structure Co., Ltd Code/Standard: JASS6,AWS D1.1 Responsibilities: Review the material certificates Review the WPS and PQR Review the NDT reports Dimension and visual inspection Review the MDR Project 8: Taketoyo Unit-5 Project Client: Mitsubishi Heavy Industries, Ltd. Manufacturer: Jiangsu Taicang Dunbon Steel Structure Co., Ltd Code/Standard: JASS6,AWS D1.1 Responsibilities: Review MPS and ITP Supervise produce process Witness NDE Witness lab test(tensile test, impact test, peeling test and cathodic disbanding test) Trace produce(fit-up,blasting, pre-heating, coating) Review and sort production documents and MDR Project 9: Kyuden Matsuura Power Plant 2B Project Client: Mitsubishi Heavy Industries, Ltd. Manufacturer: Shanghai Baosteel Steel Structure Co., Ltd Code/Standard:JASS6,AWS D1.1 Review WPS and ITP Review the PQR Supervise produce process Witness NDE Witness lab test Review documentsand MDR Project 10: SM200 1×100MW CFB Boiler Project Client: Foster Wheeler Energy Management Company Limited Manufacturer: Shanghai COSCO Kawasaki Heavy Industries Steel Structure Co., Ltd · China Code/Standard: AWS D1.1 Responsibilities: Review MPS and ITP; Supervise produce process; Witness NDE Trace produce(Cutting,fit-up,blasting, pre-heating, coating) Witness lab test(tensile test, impact test, peeling test and cathodic disbanding test) Dimension and visual inspection Review and sort production documents and MDR Project 11: Mang Duong Project Client: Foster Wheeler Energy Management Company Limited Manufacturer: Shanghai COSCO Kawasaki Heavy Industries Steel Structure Co., Ltd · China Code/Standard: AWS D1.1 Responsibilities: Raw material tracking Review the WPS,PQR and ITP Monitor welder’s certificates Supervise produce process Witness lab test(tensile test, impact test, peeling test and cathodic disbanding test); Trace produce(Cutting,fit-up,pre-heating,dimension and visual inspection,blasting,coating,delivery); Review document Review and sort production documents and MDR Supervise Loading Project 12: IGCC Power plant project Client: Mitsubishi Heavy Industries, Ltd. Manufacturer: Shanghai Baosteel Steel Structure Co., Ltd Code/Standard: Jass6,AWS D1.1 Responsibilities: Review the material certificates Review the WPS and PQR Witness the NDT Dimension and visual inspection Project 13: HitachinakakyoudouThermal Power Station project Client: Mitsubishi Heavy Industries, Ltd. Manufacturer: Shanghai Baosteel Steel Structure Co., Ltd Code/Standard: Jass6,AWS D1.1 Responsibilities: Raw material tracking Review the WPS,PQR and ITP Monitor welder’s certificates Supervise produce process Witness lab test(tensile test, impact test, peeling test and cathodic disbanding test); Trace produce(Cutting,fit-up,pre-heating,dimension and visual inspection,blasting,coating,delivery); Review document Review and sort production documents and MDR Supervise Loading Project 14: JR-Kawashaki Power Plant N1B Project Client: Mitsubishi Heavy Industries, Ltd. Manufacturer: Shanghai Baosteel Steel Structure Co., Ltd Code/Standard: Jass6,AWS D1.1 Responsibilities: Raw material tracking Review the WPS,PQR and ITP Monitor welder’s certificates Supervise produce process Block fit-up check Witness lab test(tensile test, impact test, peeling test and cathodic disbanding test); Trace produce(Cutting,fit-up,pre-heating,dimension and visual inspection,blasting,coating,delivery); Review document Review and sort production documents and MDR Supervise Loading |
個人簡介 |
---|
熟悉鋼結構制造及檢驗流程,質量管理體系,編制檢驗流程,進度計劃控制。 |